Storewide Sale!
RTC6621 - Condenser  Long Lead  17-7/8 -

RTC6621 – Condenser Long Lead 17-7/8 –

$5.87 $7.34
SKU: HARD-CF46B9 Category:
  • 30 days easy returns
  • Free shipping on orders over $40
  • Guaranteed safe & secure checkout

Description

Ignition Condenser for the contact-breaker distributor, of the Lucas type, supplied with a long lead (17-7/8 in).

Wired across the contact-breaker points, the condenser absorbs the surge of current as the points open, suppressing arcing to protect the contacts from burning and to produce a clean, strong spark at the plugs. The extended lead suits distributors with an externally mounted condenser.

There are no reviews yet.

Be the first to review “RTC6621 – Condenser Long Lead 17-7/8 –”

Shopping Cart